##plugins.themes.bootstrap3.article.main##

Hermes Carvalho Ricardo Hallal Fakury Paula Moura Leite Vilela

Abstract

The Hercílio Luz suspension bridge, built in 1926, has been out of service since 1991 due to high corrosion levels and structural element impairment. A complete rehabilitation project was developed which included the replacement of the impaired items and foundation strengthening. For this, an auxiliary structure was employed to support the central span during the rehabilitation process. A carefully studied load transfer process, where the central span loading is transferred from the eye-bar towards the auxiliary structure will be performed. For this purpose, a synchronized jacking sequence will be used, which was predefined by means of numerical model analysis. All structural elements had their designs evaluated and some geometric changes were implemented. This paper presents all the methodology developed in the rehabilitation project of Hercilio Luz bridge, as well as the development stages up to the present date.

Comments

  1. Latest Oldest Top Comments

    Downloads

    Download data is not yet available.

    ##plugins.themes.bootstrap3.article.details##

    Section
    Miscellanea

    How to Cite

    Carvalho, H., Hallal Fakury, R., & Leite Vilela, P. M. (2017). Structural integrity assessment and rehabilitating of Hercilio Luz bridge. Frattura Ed Integrità Strutturale, 11(42), Pages 93–104. https://doi.org/10.3221/IGF-ESIS.42.11

    Most read articles by the same author(s)

    Similar Articles

    1 2 3 4 5 6 7 8 9 10 > >> 

    You may also start an advanced similarity search for this article.